Right front oblique view. That one set of tracks represents about 60 hours filing and fitting. 42 track links with 42 tread caps.
Commentaires
18 December 2024, 04:36 -
Album info
I accidentally deleted the 22 pictures I had so I am reloading them. I started this build in the Nov/Dec timeframe last year. From Jan 14, I had been working on Steps 1, 2, and 3 in th instructions. Since then, I have worked on the engine, transmission, radiator housing, front panel. I have primed much of the model, Mr. Surfacer 1200 rattle can. and have started painting the interior and major subassemblies. I had initially used Vallejo Dunkel Gelb, but decided to overpaint that with Desert Yellow, which is more tan.