Kingfisher on wheels, Vought OS2U, yet another mini- groupbuild !ビュー: スライドショー モザイク リスト 1July 3, 2023 2July 3, 2023 3July 3, 2023 4July 3, 2023 5July 3, 2023 6July 3, 2023 7July 3, 2023 8July 7, 2023Testfitting the gunner‘s tub 9July 7, 2023Some more work required here 10July 9, 2023Internal rib structure added 11July 9, 2023Something like this 12July 9, 2023Ready for interior green.. 13July 10, 2023Cockpits almost finished 14July 10, 2023 15July 10, 2023 16July 10, 2023 17July 16, 2023Continuing to work on the cockpits, fit isn’t that good, styrene filling is needed. The molded on hoistsling was lost in the fitting and sanding process, so I had to replace it. 18July 16, 2023Fit on the gunner‘s tub needs some care too 19July 17, 2023Cutting Edge resin cowling is everything but cutting edge, it looks as if it was made of an old bubblegum, un- useable ! 20July 17, 2023 21July 17, 2023Monogram Kit Cowlflapring reinforced with copper wire 22July 17, 2023Maybe I can depict the cowlflaps open by carefully sawing them one by one and bending them outward……? 23July 18, 2023Engine ready for some more paint 24August 3, 2023The leading edge of the flaps had these „air-channels“ tucked under the trailinig edge of the wing. 25August 3, 2023So I tried to replicate that like this 26August 3, 2023 27August 3, 2023 28August 3, 2023This is where it will have to go, so the trailing edges have to be thinned quite a bit, let the milling begin ! 29August 3, 2023 30August 16, 2023Hinges ready 31August 26, 2023Engine done コメント2 November 2024, 04:38 - Project infoKingfisher on wheels31 画像1:48進行中Group BuildVought OS2U Kingfisher - groupbuild3. 7月 2023 まで 3. 1月 2024すべてのアルバムすべてのアルバムを見る »