Kingfisher on wheels, Vought OS2U, yet another mini- groupbuild !
1
July 3, 20232
July 3, 20233
July 3, 20234
July 3, 20235
July 3, 20236
July 3, 20237
July 3, 20238
July 7, 2023Testfitting the gunner‘s tub9
July 7, 2023Some more work required here10
July 9, 2023Internal rib structure added11
July 9, 2023Something like this12
July 9, 2023Ready for interior green..13
July 10, 2023Cockpits almost finished14
July 10, 202315
July 10, 202316
July 10, 202317
July 16, 2023Continuing to work on the cockpits, fit isn’t that good, styrene filling is needed. The molded on hoistsling was lost in the fitting and sanding process, so I had to replace it.18
July 16, 2023Fit on the gunner‘s tub needs some care too19
July 17, 2023Cutting Edge resin cowling is everything but cutting edge, it looks as if it was made of an old bubblegum, un- useable !20
July 17, 202321
July 17, 2023Monogram Kit Cowlflapring reinforced with copper wire22
July 17, 2023Maybe I can depict the cowlflaps open by carefully sawing them one by one and bending them outward……?23
July 18, 2023Engine ready for some more paint24
August 3, 2023The leading edge of the flaps had these „air-channels“ tucked under the trailinig edge of the wing.25
August 3, 2023So I tried to replicate that like this26
August 3, 202327
August 3, 202328
August 3, 2023This is where it will have to go, so the trailing edges have to be thinned quite a bit,
let the milling begin !29
August 3, 202330
August 16, 2023Hinges ready31
August 26, 2023Engine done
评论
5 April 2025, 08:25 -
Project info
团体建设

Vought OS2U Kingfisher - groupbuild
3. 七月 2023 直到 3. 一月 2024
3. 七月 2023 直到 3. 一月 2024